Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Sergio Marchionne’s Dodge Challenger to be auctioned for charity

Tue, 12 Mar 2013

Chrysler CEO Sergio Marchionne will auction his personal 2011 Dodge Challenger SRT8 392 at the Barrett-Jackson auction in Palm Beach, Fla. in April. The Challenger is painted in Pitch black accented with charcoal racing stripes hand-laid by SRT designers, and all proceeds from the sale will benefit the United Way for Southeastern Michigan charity.

Exotics get sideways at Monticello's 'Drift With the Supercars'

Mon, 25 Oct 2010

Monticello Motor Club president Ari Straus and his PR guy, Roger Garbow, were brainstorming in early October and came up with what initially sounded like a crazy idea: Bring a bunch of supercars to the track for a day of drifting. "Beer was involved," says Garbow, in an attempt to rationalize the insanity of the concept. The next day, the two decided it was still a crazy idea.

Honda cuts UK production by 50 per cent

Wed, 06 Apr 2011

Honda (UK) cuts production Japan is slowly recovering from the earthquake and tsunami that hit on 11th March. Or at least its production is. Honda has revealed that it expects its Japanese plants to resume production of 11th April – just one month after the disaster – but initially that will be at just 50% capacity due to a shaky parts supply line.